RK Mechanical Service removed the existing rooftop chiller, performed asbestos...
Colorado Trade Center Boiler Replacement
Region:
Metro Colorado
Location:
Denver, CO
Industries:
Solution:
RK Mechanical removed and disposed of the two existing steel boilers originally installed in the 1960's and replaced them with a new, high-efficiency boiler system and pumps. The project included three new boilers and a complete re-pipe of the boiler room. The new boilers total 6 million BTUs of input heat.






